Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
Information Name: | Energy efficient 240 drilling rig drilling rig _ 240 _ Cangnan Prius |
Published: | 2015-04-20 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | [HZ-180YG hydraulic drilling machine] to adapt the scope of geological survey and prospecting, exploration roads and high-rise building foundation, as well as a variety of concrete inspection hole structure, river dams, embankment filling hole drilling and grouting direct civilian geothermal wells and central air conditioning. Our company is engaged in an earlier wells rig manufacturing services for manufacturers. Here is a well drilling rig rig installation. I hope we can bring a small series introduces some help! 1. Install the rig by skilled operators to carry out, and have someone in charge of directing. In heavy rain, snow and high winds can not stand more than six rigs. 2. Install the front rig, respond to local topography, geology, hydrology, meteorology and flood level to conduct a comprehensive investigation, and check whether the foundation site underground pipes and cables. Drill a minimum distance away from overhead power lines shall comply with the relevant rules of order. 3. In the next scheduled opening flat piece of solid 240 drilling rig site, an area not less than 53.3㎡, put before the wellhead tower portion may not be smooth, but not higher than 1m have obstacles, the area for drilling rigs, power machine, mud pump installation, the remaining slurry mixer, slurry tank, drilling and other area can be stored according to site conditions, local conditions for opening the wall, flat. 4. In the scheduled opening of the excavation diameter Φ600mm, deep hole drilling rig pit 240 works 1 ~ 1.5m, and the mining cycle trough mud pit between the opening and lake sedimentation tank. 5. On the grounds have been formed by drilling rigs instructions require the installation of the tower base, tower, ground anchors, etc. 6. When the rigs ground beams installed, the diesel engine drives, winch fixed seat bottom in the drill, and then the main hoist rope wound on the drum is fixed on one end of the drum, the other end of the rope through the play tower Then bypass crane and pulley drive through swimming 240 drilling rig, and finally fixed on the tower below Shengka base beam, and after traveling block of the "U" shaped ring hanging from the tower of rings, checked before starting the tower: around the anchor is reliable. The above description is well drilling rig rig installation, my business in good faith, to all users, your request is our goal, your satisfaction is our wish, we will, as always with your new century's hand brilliant, we look forward to your visit. 240 drilling rig energy efficient _ _ Cangnan 240 drilling rig provided by Luoyang Prius Prius Drilling Equipment Co., Ltd. Road Zhiyuan, temper forward. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) strives to be and you win, symbiosis, strategic partners to move forward, the more determined to become the industry's most influential special equipment business, and you leap together to succeed ! |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility