Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
Information Name: | 600 drilling rig Price, Taishan 600 drilling rig, Prius |
Published: | 2015-04-23 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Well drilling rig on the market structure of the system configuration: 1. Power system to provide energy for the entire rig equipment; 2. Operating system and device according to process requirements of the work; 3. transmission, work crew transfer, transmission, distribution of energy equipment; 4. Control system 600 drilling rig price control all systems, equipment, according to process requirements for coordination and accurate work; 5. Assist, assist device master system works. Preparatory work before the start of the drilling rig. Our company is a professional manufacturer producing well drilling rig, location, perfect production equipment, strong technical force 600 drilling rig, detection means perfect, reliable product quality, warm and thoughtful, trustworthy, has won praise customers, Here I will introduce inspection and preparation before the start of the next well drilling rig. 1. Check all components rig, installation is stable and reliable, rope and connection is intact and clear rig dust, mud and other material things. 2. Check each operation is flexible easy to locate the tightness 600 drilling rig equipment, each V-belt tension is appropriate (especially for main and auxiliary hoist brake friction clutches and two handles), the need to add and adjust if necessary. 3. Check the power machine and mud pump. Steering should be correct. 4. Follow the lubrication specifications and illustrations rig lubricate the parts. 5. Press the regulations to the gearbox, wheel, turbine inside the main winch grease. 6. Diesel clutch disengaged, clutch 600 drilling rig mud pump price, empty plate moving sheave feed handwheel observe gearbox, main and auxiliary hoist universal shaft, turntable whether touch dead killed by the Department, if the should be adjusted. 7. stir the mud. To ensure the quality of drilling, drilling efficiency, before opening to prepare a certain quality and a certain amount of mud, usually in the Quaternary stratigraphy hole using 600mm wellhead protection tube mud hole need not less than 4m3, the viscosity at 10 ~ 20Pa .s between. 8. rig commissioning. After the rig checked ministries, should be no-load test run. Ministries observed in normal operation, before the official start of drilling. 600 drilling rig Price, Taishan 600 drilling rig, provided by Luoyang Prius Prius Drilling Equipment Co., Ltd. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) strong, credible, in Luoyang, Henan and other industry-specific equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Prius and you hand into the brilliant, for a better future! |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility