Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238
| No.13656238
- Product Categories
- Friendly Links
| Information Name: | 600 drilling rig manufacturer, the Prius, Renhua 600 drilling rig |
| Published: | 2015-04-23 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Preparatory work before the start of the drilling rig. Our company is a professional manufacturer producing well drilling rig, perfect location and 600 wells drilling equipment, production equipment, strong technical force, perfect testing means, reliable product quality, warm and thoughtful, trustworthy 600 drilling rig prices to win customers unanimous praise, here to introduce the next check and prepare well drilling rig before starting. 1. Check all components rig, installation is stable and reliable, rope and connection is intact and clear rig dust, mud and other material things. 2. Check each operation is flexible easy to locate the tightness of each triangle belt tension is appropriate (especially for main and auxiliary hoist brake and friction clutch two handles) 600 drilling rig, need to add and adjust if necessary. 3. Check the power machine and mud pump. Steering should be correct. 4. Follow the lubrication specifications and illustrations rig lubricate the parts. 5. Press the regulations to the gearbox, wheel, turbine inside the main winch grease. 6. Diesel clutch disengaged, mud clutch, empty plate moving sheave feed handwheel observe gearbox, main and auxiliary hoist universal shaft, turntable whether touch dead killed by the Department, if it should be adjusted. 7. stir the mud. To ensure the quality of drilling, drilling efficiency, before opening to prepare a certain quality and a certain amount of mud, usually in the Quaternary stratigraphy hole using 600mm wellhead protection tube mud hole need not less than 4m3, the viscosity at 10 ~ 20Pa .s between. 8. rig commissioning. After the rig checked ministries, should be no-load test run. Ministries observed in normal operation, before the official start of drilling. In hydrogeological drilling, according to explore the main principles of Exploration and Development, in addition to the hydrogeological conditions to obtain evaluation data needs, but also to achieve the maximum possible amount of water to meet 600 drilling rig parts, corresponding hole diameter increases, general water supply well construction requirements. This need to adapt to the rig, for the hydrogeological (wells) rig. Water well drilling rig big rig modulus, hyperboloid turn building, construction of public railway bridges, mine geology, ports, dams and deep wells project basis. Tower A "shaped design, reasonable design, stable, strong; 600 drilling rig manufacturer, the Prius, Renhua 600 drilling rig provided by Luoyang Prius Drilling Equipment Co., Ltd. Luoyang Prius Drilling Equipment Co., Ltd (www.. zuanji888.com/) is a leader in Luoyang, Henan Province, industry-specific equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Prius leadership with the staff warmly welcome all inquiries negotiations to create the Prius a better future. |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

