Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
- home > Supply > Impact drill drilling machine production line | Yingde impact drill drilling machine | Prius
Information Name: | Impact drill drilling machine production line | Yingde impact drill drilling machine | Prius |
Published: | 2015-04-28 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Buy drilling rigs should be noted that: many different types of impact drill drilling machine drilling machine production line, playing well, then you buy YT series rig, piling holes, then bought a large reverse circulation percussion drill rig drilling machine, stone well, then fight buy impact drill, rock fight, then you buy a pneumatic drill, no water, no electricity, fast, 200 meters, 20 hours on it, generally used for air-condition well, the price is too high, an estimated 100,000 yuan being able to buy a 200 circulation drill, the machine does not fit fieldstone bottom, you can play percussion drill rock drilling machine, 200 meters normally takes 20-30 hours, 200 meters of construction depth is accident-prone sections, generally up to one hundred accidents two-thirds. Drilling machine Installation Notes 1. Install the front rig, should have exploration data, geological conditions and confirm compliance with the requirements of the aircraft, no laying underground objects, within the operating range of how much money is no obstacle impact drill drilling machine, construction site and the overhead safe distance transmission lines to meet the requirements. 2. Drill installation site should be flat, solid, able to carry the machine to work under pressure; adverse local group, under the rig should Overlay steel protection. 3. Install rig, shall be carried out under the command of professional and technical personnel. Installation personnel must be trained, familiar with the installation process and command signals, and to ensure the safety of technical measures. 4. rig matches cranes, piling required should be based on the height and weight to choose. 5. The introduction of lighting power units should be installed low voltage transformers, voltage should not exceed 36V. Should not be used (liquid, gas) powered winches and cranes and other lifting equipment lifting people up and down. Lifting equipment should not exceed the load work. Impact drill drilling machine production line | Yingde impact drill drilling machine | Prius Prius provided by Luoyang Drilling Equipment Co., Ltd. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) strong, credible, Luoyang in Henan and other industry-specific equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Prius into the brilliant and you work for a better future! |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility