Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
Information Name: | 200 drilling rig accessories | Prius | Shaoxing 200 drilling rig |
Published: | 2015-05-11 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Well drilling rig is the company's main products for customers to create the highest quality drilling rig is our consistent aim, over the years selling products all over the country 200 drilling rig parts, well received by our customers love and support. Here to introduce you to the history of water well drilling rig next: the 2nd century BC, the Chinese have been using manpower and with the bamboo bow stretch the cone Drill formations and drilling rigs original impact, has been used in Chinese countryside after a long time. Until the 1950s, before the introduction of the rope hammer drill from abroad, in the early 1960s began to develop large pot cones, red cones and other simple drilling rig caught. 1966 years ago began to develop positive cycle rotary drilling rig, after 1974 years ago, the successful development of reverse circulation rotary drilling rigs and complex rig, in the late 1970s created a DTH vibration rotary rig. Europe and the United States in the 19th century, the main use of rope how much impact drill 200 wells drilling rig, in the 1860s, the French-first-use dial rotary drilling rig, later spread to America and rapid development. In the 1950s, it began to develop reverse circulation rotary turntable rig, and later appeared with compressed air instead of mud wash well as media rotary turntable rig, to 70 years the development of hydraulic power head rotary drilling rig. Our company will be first-class quality, good reputation, to provide users with satisfactory service. And dedicated colleagues at home and abroad and wide cooperation. Drilling rig site use recommendation 1) to go to the center of gravity balancing machine according to road conditions, such as maintaining the site, construction site prohibits arbitrary drilling 200 drilling rig works, backfill sump to do sign, narrow channel or dangerous sections for an off-mast crawler contraction, roads need to adjust the tilt angle of a drill mast landing, about 200 drilling rig tilt, swivel adjustment rig focus on the car; when the pavement or construction site water, can be used to guide the drill bit walking machine. 2) to be cooled and then hands-on service, so as to avoid causing high temperature burns, need relief after the rig hydraulic system maintenance, to avoid high pressure in the reservoir and dangerous. When removing the rig brake system master volume, master volume is prohibited load maintenance; demolition-lay non-rotating wire rope and lifting anti-lead connection, pay attention to rotating machinery damage. 3) Equipment maintenance is important to note check the water pipe road, rig all parts of bolts, nuts, whether solid, always check the condition of the wind motor lubricants, checking rig drill pipe joints and gear with grease lubrication; drilling rig stopped in a short time Work should be given a small amount of compressed air, in order to avoid the impact of sediment invade the interior of the rig. 4) the construction when Face immersed in water, use a large-diameter hole drill bits, insert drill, drill pipe out of the water to make 1 m - 2 m, to prevent mud and rocks fall into the slag hole; drilling rigs in operation Lunch time is not allowed to fall into reverse so as not to drill hole; work should pay attention to the impact of the sound and gearbox operation, identify abnormal sounds and phenomena should immediately stop and carry out the examination; plus new drill pipe, Note that the borehole kept clean to avoid the impact of sediment mixing rig inside, damaged rig parts. 200 drilling rig accessories | Prius | Shaoxing 200 drilling rig provided by Luoyang Prius Drilling Equipment Co., Ltd. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) is a leader in Luoyang, Henan Province, industry-specific equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Prius leadership with the staff warmly welcome all inquiries negotiations to create the Prius better future. |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility