Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
Information Name: | XY-2 type drilling rig Our Prius _ _ Lingtai County XY-2 type drilling rig |
Published: | 2015-05-16 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Pollution and harm full hydraulic drilling rig in full hydraulic engineering hydraulic oil rig hydraulic system drive, hydraulic drive system in the production process requires the use of hydraulic oil and hydraulic oil in the production process, will produce some pollution and harm, So when the production needs to do maintenance to prevent contamination phenomena. Hydraulic drilling rig hydraulic oil leak, it will be a lot of problems caused by contamination of the hydraulic fluid XY-2 type drilling rig drilling depth, can cause the pump, valve and other component parts of early wear and excessive oil filter clogging, the question arises not only increase the hydraulic drilling rig maintenance and management, will reduce drilling rig component parts of life. After the full hydraulic drilling rig hydraulic oil leak, valves and other key parts prone to wear and tear, will cause changes in the hydraulic system or component characteristics, thereby causing the accuracy and performance degradation, reliability will deteriorate, when the leak is serious, pollution also seriously deepened, so will lubricate the pump stuck or damaged. So XY-2 type drilling rig prices, for the production of full hydraulic drilling rig, hydraulic oil pollution pollution producers need to pay attention. Drilling rig construction process should comply with the rules: 1. The formal application before the drill, should check whether the power supply capacity required for rig capacity. 2. Use the instructions required to check the circuit, the voltage range, leakage protection switch and operating handle. 3. formal application drilling rigs should slow down, align the drill holes XY-2 type drilling rig, when the current pointer favor no-load condition XY-2 type drilling rig picture, which began under the drill holes. The drilling operation process, should always observe the meter, such as when more than the rated current, should slow speed drill. 5. To prevent motor overload in the control box is set overcurrent relay; after the overcurrent relay, should be spaced about 10min restart, restart, it should not be contained within 30min of another. 6. Use should avoid relying inching instantaneous of forward and reverse. 7. When the rig operation, should prevent the cable being entangled drilling have someone care. 8. Operation To change the rotation direction of the drill pipe, drill pipe, etc. shall complete stop before starting. XY-2 type drilling rig Our Prius _ _ Lingtai County XY-2 type drilling rig provided by Luoyang Prius Drilling Equipment Co., Ltd. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) is a leader in Luoyang, Henan Province, industry-specific equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Prius leadership with the staff warmly welcome all inquiries negotiations to create the Prius better future. |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility