Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238
| No.13656238
- Product Categories
- Friendly Links
| Information Name: | Qingyang 130 drilling rigs, 130 drilling machine manufacturers, Prius |
| Published: | 2015-06-29 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Drilling machine is important to solve the problem of people drinking utensils, 130 drilling machine how much money, to people's lives has a significant impact, drilling machines as people demand has been constantly improved and now the drilling machine is has many advantages, let's look in detail. Drilling rig machine by digestion of foreign advanced technology, according to market-based construction and deep drilling and other needs design and manufacture of fully functional drilling machine. This high degree of automation, 130 drilling machine manufacturers, rock breaking ability, high efficiency, safe, reliable, convenient, full-featured, using a different tool can be a variety of complex stratigraphic soil, rock, gravel layer, sand layer and the like were drilling; you can also use a spiral drill pipe drilling, rope coring, drilling with tube or air hammer drilling; machine structure is also beneficial to wash well and grouting. Drilling machine Installation Notes 1. Install the front rig, should have exploration data, geological conditions and confirm compliance with the requirements of the aircraft, no laying underground thing, no obstructions within the operating range, a safe distance from the construction site and overhead transmission lines to meet the requirements . 2. Drill installation site should be flat, solid, able to carry the machine to work under pressure; adverse local group, under the rig should Overlay steel protection. 3. Install rig, shall be carried out under the command of professional and technical personnel. Installation personnel must be trained, familiar with the installation process and command signals 130 drilling rigs video, and to ensure the safety of technical measures. 4. rig matches crane, Qingyang 130 drilling rigs, piling required should be based on the height and weight to choose. 5. The introduction of lighting power units should be installed low voltage transformers, voltage should not exceed 36V. Should not be used (liquid, gas) powered winches and cranes and other lifting equipment lifting people up and down. Lifting equipment should not exceed the load work. Qingyang 130 drilling rigs, 130 drilling machine manufacturers, Prius Prius provided by Luoyang Drilling Equipment Co., Ltd. Road Zhiyuan, temper forward. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) aims to become and you win symbiosis, strategic partners to move forward, more determined to become the most influential industry-specific equipment business, and you leap together to success ! |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

