Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656238

- Product Categories
- Friendly Links
Information Name: | Construction Engineering rig video, Lianzhou construction engineering drill Prius |
Published: | 2015-07-14 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Construction of Bridge Drilling Rig need more stability in modern construction environment, especially when the bridge bored piles must be noted that a series of problems, the most important to note is the location of drilling rig, engineering drilling rig construction If the position is not well established, then the construction of production efficiency and safety, it will have other effects, so the drilling rig, Rig Lianzhou building must be balanced so that the base support pad, the pad was not branched pressure on the casing, and the use of impact drill for drilling rig, you must need to pay attention to the use of cables or braces to be reinforced, so to ensure safety in production of construction. For rotary drilling rig, it wants to maintain good productivity, we must use the standard ruler for calibration, the benefits of this is that to ensure the drilling rig lifting pulley, wheel center, casing in a vertical center must eat line, the deviation shall not be greater than about 2CM, drilling rig during drilling must be carried out for the verification within the prescribed time, to prevent the occurrence of dislocation. Drilling rig during the drilling operation, the need for continuous work, can not be changed for a long time to stop the drilling, bored pile foundation form needs to adapt to different geological conditions, can not appear unable to solve the problem, and also needs time to produce small footprint, higher carrying capacity, bored pile high technical requirements, pouring underwater concrete step more, there is still a complex production process, construction rig manufacturers, producing a larger workload problems, so in the production time, should try to ensure the stability of production work drilling rig, construction drilling equipment, to prevent quality defects due to human causes, serious impact on the drilling rig production process. Drilling Rig process different requirements for speed speed is one of the factors Rig reflect production quality, high-speed efficiency is a good Rig essential quality. Drilling rig will be used in the production process of different drilling methods, different drilling process for the production of different characteristics, rig technology often used methods are: Diamond core drilling, reverse circulation continuous coring drilling, directional drilling into methods, different processes for drilling speed have different production requirements. Rig in production, need to meet a variety of different methods require drilling process, and can be very aspects of drilling speed adjustment, the production and construction process, the power head drilling rig can satisfy the different production needs, the relative vertical type drilling rig, the drilling rig power head speed range is wide, and can be variable speed, so it can better meet the different requirements of drilling technology, which can be seen for speed Rig Quality. Construction Engineering rig video, Lianzhou construction drilling rig, provided by the Luoyang Prius Prius Drilling Equipment Co., Ltd. Road Zhiyuan, temper forward. Luoyang Prius Drilling Equipment Co., Ltd. (www.zuanji888.com/) aims to become and you win symbiosis, strategic partners to move forward, more determined to become the most influential industry-specific equipment business, and you leap together to success ! |
Admin>>>
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34223 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Prius Drilling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility